Adco ... developing the South-East Asset

Name of client :  Abu Dhabi Co for Onshore Oil Operations (Adco)
Budget :  $650 million
Facility type : Oil Field Development
Sector : Oil
Status : Construction
Location : Abu Dhabi
PMC : CH2M Hill
Main Contractor : Descon, Al Asab Contracting Establishment

Background

Abu Dhabi Company fo Onshore Oil Operations (Adco) has announced plans to implement tie-in works at its current South East Asset. In effect, the works which will focus mainly on pipelines and wellheads will cover up Asab, Sahil, Qusahwira and Shah Field, as they are all part of the South-East Asset.

Project status

December 2015: Construction works are in process by Al Asab and are progressing further.

November 2015: Descon Engineering is currently involved in carrying out the installation of facilities which will be completed in approximately 30 months.

Project scope

The project scope of work consists of the following:

• Provision of links of pipelines from well manifold

• Flowlines

• 7/8 manifolds

• Associated Facilities

The works are split into 2 packages A & B.

Package A includes:

• Construction of facilities at 54 wells

• Locations include Asab field and four wells at the Sahil field

Package B includes:

• Facilities installation

• Supply and installation of tie-ins at 60 wells

• Locations include Shah, Mender and Qusahwira fields

Project finance

Adco is the project client.  Adco is a joint venture of Abu Dhabi National Oil Company -Adnoc, Total, Inpex and GS Energy.

Project schedule

Feasibility Study  Q1-2011
Construction  Q4-2015
Completion  Q1-2018