Saudi Aramco-Ain Dar/Shedgum Sea Water Conversion Plant, 115,000,000, Construction, Sea Water Conversion, SNC Lavalin, Snamprogetti (U.K.).

Saudi Aramco-Berri Gas Plant Cogeneration, 128,000,000, Construction, Cogeneration Plant, Foster Wheeler-Sofcon, JGC.
Saudi Aramco-East/West Pipeline YCOT Control System Replacement, Unknown, Construction, Bulk Storage Plants, Not yet appointed, CAT.
Saudi Aramco-Haradh GOSP III, 320,000,000, LSTK Contract Award, Gas  Processing, Foster Wheeler, Techint.
Saudi Aramco-Harmaliyah Gas Oil Separation Facility, 135,000,000, Project On Hold, Gas and Oil Separation Plant, Not yet appointed, Not yet appointed.
Saudi Aramco-Hawiyah Gas Plant Expansion, 400,000,000, EPC Bids Under Eval., Gas Processing, Jacobs Engineering, Not yet appointed.
Saudi Aramco-Hawiyah NGL & Associated Gas Recovery Plant (HNRP), 1,100,000,000, Construction, Gas Processing, Jacobs Engineering, JGC / Snamprogetti.
Saudi Aramco-Hawiyah NGL Recovery Pipelines, 200,000,000, Partially Awarded, Natural Gas Pipeline Network, Bechtel & Petrocon (FEED), Not yet appointed.
Saudi Aramco-In Kingdom PMC, Unknown, Contract Awarded, Oil, Various, Various.
Saudi Aramco-Independent Power Plants (IPP), Unknown, Construction, Power, International Power / Saudi Oger, International Power / Saudi Oger.
Saudi Aramco-Juaymah Gas Plant Expansion, 200,000,000, EPC Contract Award, Gas  Processing, Jacobs Engineering, Tecnicas Reunidas.
Saudi Aramco-Juaymah NGL Plant Cogeneration, 150,000,000, Construction, NGL Plant, Fichtner International , Power/Saudi Oger/Mitsui.
Saudi Aramco-Jubail Export Refinery, 5,000,000,000, Planning, Refinery, Not yet appointed, Not yet appointed.
Saudi Aramco-KGP (Khursaniyah Gas Plant), 4,000,000,000, Construction, Offshore Oil / Gas Production, –, Bechtel / Technip.
Saudi Aramco-Khuff Gas Well Cathodic Protection & Power System, Unknown, SOI-Solicitation of Interest, Gas, Not yet appointed, Not yet appointed.
Saudi Aramco-Khurais Central Processing Facilities, 1,240,000,000, Prequalification, Gas Processing, Foster Wheeler, Not yet appointed.
Saudi Aramco-Khurais Crude Increment Dvlpment Program (Overview), 4,000,000,000, Partially Awarded, Field Development, Foster Wheeler, Various.
Saudi Aramco-Khurais Downstream Pipelines, 690,000,000, Bids Under Evaluation, Pipeline, Foster Wheeler, Not yet appointed.
Saudi Aramco-Khurais Residential & Industrial Complex, 155,000,000, Prequalification, Infrastructural facilities, Not yet appointed, Not yet appointed.
Saudi Aramco-Khurais Seawater Supply & Injection Facilities, 980,000,000, LSTK Bid Submission, Water Injection, Jacobs/SNC Lavalin/SaudConsult, Not yet appointed.
Saudi Aramco-KPF (Khursaniyah Producing Facilities), 4,000,000,000, Construction, Oil / Gas production, Not yet appointed, Snamprogetti (Italy).
Saudi Aramco-Manifa Field Development, 7,000,000,000, Planning, Offshore, Oil / Gas Production, Not yet appointed, .
Saudi Aramco-Nuayyim Field Development, 510,000,000, Planning, Field Development, Not yet appointed, Not yet appointed.
Saudi Aramco-Petro Rabigh-Rabigh Refinery Expansion , 9,900,000,000, Construction, Refinery, Foster Wheeler, Various.
& Petrochemical Complex ( Overview), .
Saudi Aramco-Petro Rabigh-Rabigh Refinery Expansion &, Unknown , Construction, Power, Foster Wheeler, Various.
Petrochemical Complex ( Power Plant).
Saudi Aramco-Qatif Gas Facilities at Berri Gas Plant, 350,000,000, Construction, Sulfur Recovery, Foster Wheeler, Technip Italy.
Saudi Aramco-Rabigh Refinery Expansion & Petrochemical , 4,300,000,000, EPC Contract Award, Refinery, Foster Wheeler, Techint.
Complex (Offsites & Utilities), , , , .
Saudi Aramco-Rabigh Refinery Expansion & Petrochemical , 4,300,000,000, Bids Under Evaluation , Petrochemical, Foster Wheeler, Not yet appointed.
Complex (Petrochemical Package), .
Saudi Aramco-Rabigh Refinery Expansion & Petrochemical , 4,300,000,000, Bids Under Preparation, Oil refinery, Foster Wheeler, Not yet appointed.
Complex (Refinery Package), .
Saudi Aramco-Rastanura FCCU, 550,000,000, Project Proposal, Fluid Catalytic Cracker, Kellog Brown & Root, Not yet appointed.
Saudi Aramco-Rastanura Isomerisation, 140,000,000, Project On Hold, CCR; Isomerisation, Kellog Brown & Root, Not yet appointed.
Saudi Aramco-Rastanura Refinery Cogen Interconnection Facilities, 195,000,000, Project Funding, Cogeneration Plant, –, Not yet appointed.
Saudi Aramco-Rastanura Refinery Cogeneration, Unknown, Construction, Oil  Refinery, Fichtner International , Oger/Mitsui.
Saudi Aramco-Riyadh Refinery Debottlenecking and CCR Revamp, 150,000,000, Feasibility Study, Refining, Not yet appointed, Not yet appointed.
Saudi Aramco-Riyadh Refinery Diesel Hydrotreating, 183,000,000, Construction, Diesel Hydro Desulphurisation, Foster Wheeler, Technip Italy.
Saudi Aramco-Safaniyah North Artificial Lift, 400,000,000, EPC Contract Award, Offshore Oil Production, Worley, NPCC.
Saudi Aramco-Shaybah Deep Cut Gas Plant to Abqaiq Gas Plant Pipelines, Unknown, Planning, Pipeline, Not yet appointed, Not yet appointed.
Saudi Aramco-Shaybah Field Development, 1,435,000,000, Bids Under Evaluation, Field Development, Not yet appointed, Not yet appointed.
Saudi Aramco-Shedgum Gas Plant Cogeneration, 195,000,000, Construction, Gas  Processing, Fichtner Intl Power/Saudi , Oger/Mitsui.
Saudi Aramco-Third Party Co generation Plant, 620,000,000, Preliminary Agreement, Power, –, –.
Saudi Aramco-Uthmaniyah Gas Plant Cogen Interconnection Facilities, 190,000,000, Project Funding, Cogeneration Plant, –, Not yet appointed.
Saudi Aramco-Uthmaniyah Gas Plant Cogeneration, 255,000,000, Construction, Gas Processing, Fichtner Intl Power/Saudi , Oger/Mitsui.
Saudi Aramco-Uthmaniyah GOSPS 7,8 & 10Control Sys Upgrade, Unknown, Detailed Engineering, GOSP, Not yet appointed, Not yet appointed.